Skip to main content

At a hospital in Oxford they were having trouble with a ramp causing a potential health & safety risk with the height on the ramp and the drop below.

After several site visits with the client, trust and architects and different design proposals 358 mesh with clamps to go over the wall was accepted.

Due to the area being a live working site and also our operatives working at height we included access equipment and traffic management in our package.

Contact Us
  • This field is for validation purposes and should be left unchanged.